Progress

Building in the open.

We are building the P47 one milestone at a time. This is where we show the work as it happens — prototypes, tests, setbacks and progress. No launch date until it is ready.

JUL 2026

Studio studies complete

Three full studio studies of the P47 photographed and catalogued. Carbon layup, GT-Motion module, and complete assembly documented for press and development reference.

  • Carbon main stand — studio study photographed
  • GT-Motion actuator set — detail documented
  • Complete cockpit — full assembly study captured
P47 studio study
Studio study — P47 complete assembly
MAY 2026

GT-Motion actuator prototype

First GT-Motion actuator set assembled and bench-tested. Control module firmware v0.4 running initial force-feedback profiles. Early results show clean response across brake and steering channels.

  • GT-Motion carbon frame — first assembly complete
  • Control module — firmware v0.4, force-feedback profiles
  • Actuator set — bench test, 4-channel response mapped
  • Control software — telemetry logging, latency under 12ms
GT-Motion module detail
GT-Motion — actuator set, first assembly
MAR 2026

Carbon-fibre main stand layup

First full carbon-fibre main stand laid up and cured. Aluminum and composite frame mated to the carbon structure. Gear-shift holder and seat slider mounts test-fitted.

  • Carbon-fibre main stand — first full layup and cure
  • Aluminum + composite frame — mated to carbon structure
  • Gear-shift holder — mount test-fitted
  • Seat slider — track alignment verified
P47 chassis detail
Chassis — carbon main stand, first layup
JAN 2026

P47 programme begins

The P47 programme is officially initiated. Design intent set: a carbon-fibre racing cockpit built to the standard of the cars it honours, designed for the home. No compromises, no tubular steel.

  • Design intent finalised — carbon-first architecture
  • Component specification drafted — chassis, motion, seat
  • Material sourcing — carbon fibre, aluminum, composite

Want to follow the build?

Register interest →